Installation of Hydromulch - Binded Fibre Matrix Hydromlulch - Bonded fibre matrix (BFM) at the rate of 5 tonnes/ha.
To be applied to both sides of the highway between chainages 650-2000m & 3400-4200m from the toe of the pavement batter to the clearing line.
RoadTek will supply
- traffic management
- on-site supervision
- water
- prepared surface
- follow-up watering